Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia, Unpublished PhD Thesis, , Brunel University.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis, Unpublished PhD Thesis, , Brunel University.

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials, Unpublished PhD Thesis, , Brunel University.

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities, Unpublished PhD Thesis, Business School, Brunel University.

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects, Unpublished PhD Thesis, , Brunel University.

Almutairi, A M S (2017) Protecting the rights of temporary foreign 'low-skilled' workers in the Saudi construction industry: a case for legal reform, Unpublished PhD Thesis, Department of Politics, History and Law, Brunel University.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK, Unpublished PhD Thesis, , Brunel University.

Clark, G G (1993) Rule-based integrated building management systems, Unpublished PhD Thesis, , Brunel University.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Jashapara, A (1995) Learning in organizations: A study of the UK construction industry, Unpublished PhD Thesis, Henley Management College, Brunel University.

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment, Unpublished PhD Thesis, , Brunel University.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD, Unpublished PhD Thesis, , Brunel University.

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Nathan, P (1991) Project planning and control systems: An investigation into their application and implications of usage in the UK construction industry, Unpublished PhD Thesis, , Brunel University.

Paling, D R (1982) Industrial relations in the building, civil engineering and engineering construction industries, Unpublished PhD Thesis, , Brunel University.

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

  • Type: Thesis
  • Keywords: case study; case survey; design and build; general contracting; mathematical modelling performance; procurement method; project management
  • ISBN/ISSN:
  • URL: http://bura.brunel.ac.uk/handle/2438/4320
  • Abstract:
    The problem of determining an appropriate procurement form for the management of a construction project has been surrounded by controversy and strongly held opinions. The work reported here attempts to indicate some rational basis for choice in this decision by identifying those factors which significantly affect project performance, with particular reference to the distinctions between design build and traditional procurement forms. Two basic propositions are addressed by the work. The former is that design build forms perform better than traditional forms. This view is based on the conventional, construction industry view of the factors which affect performance. The latter is that contextual factors and the management and organisation of the construction process are the major determinants of project performance. This view stems from the application of management theory to the construction process and takes into account more and diverse variables than the conventional view. The factors which affect construction project performance are identified by reviewing three basic areas which are fundamental to the research. The first is the construction process and the way it has been treated and analysed in the past, which has been based around the traditional form of organisation. The second is the perceptions held concerning the design build process and how this procurement form has developed over recent years. A taxonomy of design build organisations is presented. Finally, the literature concerning project management, in general and specifically applied to the construction process, is reviewed and those factors which have been identified as affecting project performance identified. Following on is a review of performance measures which have previously been adopted. Based on this review a number of measures are chosen to compare performance (a mixture of objective and subjective measures). The foregoing leads to the situation where two research models are proposed and tested, by the formulation of related hypotheses, in two separate phases of the research process. A sample of 47 projects was used in the initial phase of the work and this was followed up by 27 detailed case studies in the subsequent phase. The data collected are analysed using partial correlation analysis as the principal analytic tool and the main results are reported below. The primary conclusion to be drawn is that procurement form is not a good predictor of performance. In general, the management, organisation and contextual variables are found to be more strongly associated with performance. Specifically, increased client complexity and dependence are found to be associated with reduced performance, as are increased project complexity and uncertainty. Document certainty and completeness and the degree of competition in letting construction works are all factors found to affect performance. Familiarity and differentiation are organisational factors which are found to be strongly associated with performance. Finally, it is shown that different procurement forms can be located on a structure grid and that those organisations which are appropriately located are associated with higher levels of performance.

Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry, Unpublished PhD Thesis, Department of Mechanical Engineering, Brunel University.

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry, Unpublished PhD Thesis, , Brunel University.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application, Unpublished PhD Thesis, , Brunel University.